$ lua ytraffic.lua Result 1: Direction SB Description SCHEDULED WORK CREW; NO LANE GIVEN; SCHEDULED THROUGH NOVEMBER 23RD; NORTHBOUND DELAYS LIKELY DURING THE EVENING RUSH HOUR. Severity 2 EndDate 1164292260 Title Road construction, on I-635 SB at PARALLEL AVE type construction Longitude -94.677120 Latitude 39.126600 ReportDate 1150905718 UpdateDate 1160069030 Result 2: Direction N/A Description SCHEDULED WORK CREW; LEFT LANE CLOSED; STAY RIGHT; SCHEDULED UNTIL OCTOBER 23RD; EXPECT HEAVY TRAFFIC DURING THE MORNING DRIVE. Severity 2 EndDate 1161602100 Title Heavy traffic, on I-70 at PASEO type incident Longitude -94.558914 Latitude 39.095924 ReportDate 1158673218 UpdateDate 1160069034 Result 3: Direction NB Description SCHEDULED WORK CREW; NO LANE GIVEN; SCHEDULED THROUGH OCTOBER 14TH; PM DRIVE TIME BACK UPS ARE COMMON WITH 5 TO 10 MINUTE DELAYS. Severity 2 EndDate 1160834400 Title Road construction, on I-435 NB at MISSOURI RIVER BRG type construction Longitude -94.498230 Latitude 39.149960 ReportDate 1151097836 UpdateDate 1160069030